Buildings and Grounds |
ECDPW Project Nbr 2019-999-09 Charge Erie - Countywide Electric Vehicle Charging Stations |
October 19, 2022 |
|
|
Buildings and Grounds |
SUNY ECC North Campus 2020 Spring Student Center Exterior Upgrades *General* |
September 1, 2022 |
|
|
Buildings and Grounds |
SUNY ECC North Campus 2020 Spring Student Center Exterior Upgrades *Mechanical* |
September 1, 2022 |
|
|
Buildings and Grounds |
EC DPW Project Nbr 2018-816-02 County of Erie Department of Social Services 3rd Floor Renovations - Rath Building *General Construction* |
August 30, 2022 |
|
|
Buildings and Grounds |
EC DPW Project Nbr 2018-816-02 County of Erie Department of Social Services 3rd Floor Renovations - Rath Building *Electrical* |
August 30, 2022 |
|
|
Buildings and Grounds |
EC DPW Project Nbr 2018-816-02 County of Erie Department of Social Services 3rd Floor Renovations - Rath Building *Plumbing* |
August 30, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-911-01 Grover Cleveland Golf Course Schenck House & Restroom Roof Replacement and Structural Repairs |
August 19, 2022 |
|
|
Buildings and Grounds |
Electric Vehicle Charging Stations & Installation |
July 28, 2022 |
|
|
Highways |
2022 Bridge Painting and Vertical Down Repairs (4 Bridges) |
July 21, 2022 |
|
|
Highways |
Chestnut Ridge Park Culvert Stone Wall Replacement |
June 30, 2022 |
|
|
Highways |
2022 Overlay A |
June 30, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-800-02 Erie County Board of Elections 4th Floor I-PAD Storage Area *General* |
June 21, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-800-02 Erie County Board of Elections 4th Floor I-PAD Storage Area *Electrical* |
June 21, 2022 |
|
|
Buildings and Grounds |
ECDPW Project 2021-810-01 Erie County Holding Center Hot Water Tank Replacement **Electrical REBID** |
June 17, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr EG-17-01 SUNY Erie Community College City Campus 2022 Ellicott Street Building Skylight Reconstruction and Roof Repairs |
May 19, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-810-01 Erie County Holding Center 2021 Hot Water Tank Replacement Project *Plumbing* |
May 6, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-810-01 Erie County Holding Center 2021 Hot Water Tank Replacement Project *Abatement* |
May 6, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-810-01 Erie County Holding Center 2021 Hot Water Tank Replacement Project *Electrical* |
May 6, 2022 |
|
|
Highways |
2022 Bridge Deck Washing (209 Bridges) |
April 7, 2022 |
|
|
Highways |
2022 Bridge Deck Sealing (32 Bridges) |
April 7, 2022 |
|
|
Highways |
Rehabilitation of Borden Road(CR322)-Phase 1 Strasmer Rd to Broadway (NY130) |
March 31, 2022 |
|
|
Buildings and Grounds |
Rath Building Structural Repair and Parking Garage Floor Recoat |
March 24, 2022 |
|
|
Buildings and Grounds |
Buffalo and Erie County Central Library East Elevator Machine Room & Chimney Exterior Rehabilitation |
March 8, 2022 |
|
|
Highways |
Rehab Chestnut Ridge Casino Parking & Wendt Beach access Road and Parking |
March 3, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2019-816-02 Erie County Rath Building Elevator Modernization - Electrical *Re-Bid* |
February 24, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2022-880-01 Highmark Stadium 2021-22 Year 9 Capital Improvement Allowance Projects *General* |
February 22, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2022-880-01 Highmark Stadium 2021-22 Year 9 Capital Improvement Allowance Projects *Electrical* |
February 22, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2022-880-01 Highmark Stadium 2021-22 Year 9 Capital Improvement Allowance Projects *Plumbing* |
February 22, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2022-880-01 Highmark Stadium 2021-22 Year 9 Capital Improvement Allowance Projects *Mechanical* |
February 22, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2022-880-01 Highmark Stadium 2021-22 Year 9 Capital Improvement Allowance Projects *Site* |
February 22, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2020-903-01 Buffalo & Erie County Botanical Gardens - 2020 Replacement of Vents and Vent Control Systems at Various Houses *General* |
February 17, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2020-903-01 Buffalo & Erie County Botanical Gardens - 2020 Replacement of Vents and Vent Control Systems at Various Houses *Electrical* |
February 17, 2022 |
|
|
Highways |
Isle View Park Dock Reconstruction |
February 17, 2022 |
|
|
Highways |
Resurfacing of Wehrle Drive from Harlem Road (NYS 240) to Aero Drive |
February 15, 2022 |
|
|
Buildings and Grounds |
ECPDW Project #2019-816-01 Erie County Rath Building Parking Level Sprinkler System Replacement Project *Re-Bid* |
January 31, 2022 |
|
|
Highways |
Rehabilitation of North Ellicott Creek Road Bridge over North Diversion Channel CAP-232-01-21 |
January 13, 2022 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2019-816-01 Erie County Rath Building Parking Level Sprinkler System Replacement Project |
December 28, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2019-816-02 Erie County Rath Building Elevator Modernization Project *General* |
December 21, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2019-816-02 Erie County Rath Building Elevator Modernization Project *Mechanical* |
December 21, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-820-01 Erie County Family Court Building Roof Replacement Project |
December 20, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2019-954-03B - SUNY ECCC 2021 Burt Flickinger Athletic Center Exterior Improvements Project |
December 16, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-818-01 Buffalo Niagara Convention Center Façade and Entry Improvements *REBID* |
December 16, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-999-01 SUNY ECC Campus-Wide 2021 Sidewalk and Concrete Curb Replacement Project |
November 30, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-818-01 Buffalo Niagara Convention Center Façade and Entry Improvement Project *General* |
November 23, 2021 |
|
|
Buildings and Grounds |
ECDPW Project 2021-818-01 Buffalo Niagara Convention Center Façade and Entry Improvement Project *Electrical* |
November 23, 2021 |
|
|
Buildings and Grounds |
ECDPW Project 2021-818-01 Buffalo Niagara Convention Center Façade and Entry Improvement Project *Mechanical* |
November 23, 2021 |
|
|
Buildings and Grounds |
ECDPW Project 2021-818-01 Buffalo Niagara Convention Center Façade and Entry Improvement Project *Plumbing* |
November 23, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2019-954-03A Erie Community College City Campus Natatorium Improvement Project - General |
October 28, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2019-954-03A Erie Community College City Campus Natatorium Improvement Project - Electric |
October 28, 2021 |
|
|
Highways |
2022 Bridge Rehabilitation of Ward Drive over Big Gulf Creek (BIN3362260) in Chestnut Ridge Park |
October 14, 2021 |
|
|
Buildings and Grounds |
ECDPW Project #2020-956-05 SUNY ECC North Campus 2020 Kittinger Hall Window and Door Replacement |
October 7, 2021 |
|
|
Highways |
Two Mile Creek Greenway Restoration |
September 8, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-812-03 Buffalo & Erie County Public Library Escalator Renovations |
August 10, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2020-800-01 134 West Eagle Fuel Tank Replacement *Solicited General Construction Bids* |
July 1, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-821-01 Lincoln Building Phase 2 *General* |
June 17, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-821-01 Lincoln Building Phase 2 *Electrical* |
June 17, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-821-01 Lincoln Building Phase 2 *Mechanical* |
June 17, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2021-821-01 Lincoln Building Phase 2 *Plumbing* |
June 17, 2021 |
|
|
Buildings and Grounds |
DPW Project #2020-800-01 - 134 W. Eagle Fuel Tank Replacement REBID |
May 24, 2021 |
|
|
Highways |
Reconstruction of Alden-Crittenden Road and Rehabilitation of Bullis Road Project |
May 6, 2021 |
|
|
Buildings and Grounds |
DPW Project 2020-815-01 Erie County Old City Hall Clock Tower and Roof Repairs |
May 4, 2021 |
|
|
Buildings and Grounds |
DPW Project #2020-800-01 - 134 W. Eagle Fuel Tank Replacement |
May 4, 2021 |
|
|
Buildings and Grounds |
Erie County Health Lab CC Renovations - Ph 2 DPW Project #2021-885-01 |
April 6, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2019-816-03 Rath Building Structural Repairs |
March 25, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2020-818-01 Buffalo Niagara Convention Center Lobby Renovations *General* |
March 11, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2020-818-01 Buffalo Niagara Convention Center Lobby Renovation *Electrical* |
March 11, 2021 |
|
|
Highways |
Local Pedestrian Safety Action Plan |
March 5, 2021 |
|
|
Buildings and Grounds |
ECDPW Project 2019-956-03 SUNY Erie North Campus ADA & Electrical Upgrades * Electrical* |
March 4, 2021 |
|
|
Buildings and Grounds |
ECDPW Project 2019-956-03 SUNY Erie North Campus ADA & Electrical Upgrades * General* |
March 4, 2021 |
|
|
Buildings and Grounds |
ECDPW Project 2019-956-03 SUNY Erie North Campus ADA & Electrical Upgrades * Mechanical* |
March 4, 2021 |
|
|
Buildings and Grounds |
ECDPW Project 2019-956-03 SUNY Erie North Campus ADA & Electrical Upgrades * Plumbing* |
March 4, 2021 |
|
|
Buildings and Grounds |
ECDPW Project 2020-880-03 Buffalo Bills Stadium Year 8 Capital Improvement Allowance Project |
February 11, 2021 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2020-875-01 Erie County Fire Training Academy Exterior Waterproofing and Roof Recoating |
February 11, 2021 |
|
|
Highways |
Bridge Painting and Steel Repairs of Leydecker Road Bridge (BIN 332884) over Cazenovia Creek |
December 22, 2020 |
|
|
Buildings and Grounds |
SUNY Erie Community College North Campus - Bell Sports Center Partial Roof Repairs, Recoating & Replacement |
December 18, 2020 |
|
|
Buildings and Grounds |
EC DPW Project Nbr 2020-886-01 Erie County Medical Examiner’s Office Anthropology Lab Renovation – Phase 6 |
December 17, 2020 |
|
|
Highways |
Rehabilitation or Replacement of Culverts - 2020 Miscellaneous Culvert Group |
December 15, 2020 |
|
|
Highways |
Shoreline Trail Repaving & Enhancements - Unofficial |
December 3, 2020 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2018-955-01 SUNY Erie Community College City Campus ADA Upgrades |
November 24, 2020 |
|
|
Highways |
Rehabilitation of East and West Phase II |
November 19, 2020 |
|
|
Highways |
Rehabilitation of North Main Street Phase II |
November 19, 2020 |
|
|
Buildings and Grounds |
ECDPW Project Nbr 2019-812-07 Buffalo & Erie County Public Library - Public Address System Upgrades |
November 9, 2020 |
|
|
Highways |
Slide Remediation of Ketchum Road (CR 501) |
November 5, 2020 |
|
|
Buildings and Grounds |
Erie County Health Lab CC Building COVID Renovations DPW Project Nbr 2020-885-01 |
October 15, 2020 |
|
|
Highways |
South Creek Road Culvert Replacement |
October 1, 2020 |
|
|
Highways |
2020 Overhead Sign Structure (245-S01) Removal |
September 10, 2020 |
|
|
Highways |
Construction of Stone Parapet Walls Chestnut Ridge Park Culverts PK-27 & PK-28 |
August 6, 2020 |
|
|
Highways |
2020 Capital Overlay Contract A |
May 21, 2020 |
|
|
Highways |
Maple Road (CR192) Rehabilitation |
April 2, 2020 |
|
|
Buildings and Grounds |
Erie Community College Campus-wide 2019 Replacement of Emergency Generators - Electrical |
March 31, 2020 |
|
|
Buildings and Grounds |
Erie Community College Campus-wide 2019 Replacement of Emergency Generators - Plumbing |
March 31, 2020 |
|
|
Highways |
2020 Bridge Joints and Overlays (7 bridges) |
March 26, 2020 |
|
|
Highways |
Hillcroft Drive Bridge over Big Sister Creek (BR 707) Replacement |
March 19, 2020 |
|
|
Highways |
Elmwood Ave (CR 119) Pedestrian & Bicycle Improvements Project Phase II |
February 20, 2020 |
|
|
Highways |
2020 - Bridge Washing, Various Bridges |
January 30, 2020 |
|
|
Highways |
Pontiac Road Bridge Replacement |
January 30, 2020 |
|
|
Buildings and Grounds |
County of Erie - New Era Field Year 7 Capital Improvements Allowance Projects - DPW Project No 2019-880-04 |
January 23, 2020 |
|
|
Buildings and Grounds |
County of Erie - 608 William Street IT Upgrades - DPW Project Nbr. 2019-881-02 |
January 21, 2020 |
|
|
Buildings and Grounds |
SUNY Erie City Campus Burt Flickinger Athletic Center 2019 Exterior Recaulking ECDPW PROJECT NO. 2019-954-02 |
January 9, 2020 |
|
|
Buildings and Grounds |
Erie County Park and Highway Facilities - Oil Water Separator and Facility Improvements |
November 26, 2019 |
|
|
Buildings and Grounds |
Buffalo & Erie County Public Library – Presidential Suite Museum |
November 7, 2019 |
|
|
Buildings and Grounds |
Erie County Medical Examiner’s Office Morgue Renovation – Phase 5 (Equipment) RE-BID |
November 6, 2019 |
|
|
Highways |
Abbott, McKinley and Armor Duells Rehabilitation |
October 24, 2019 |
|
|
Buildings and Grounds |
Erie County Medical Examiner’s Office Morgue Renovation – Phase 5 (Asbestos) |
October 21, 2019 |
|
|
Buildings and Grounds |
Erie County Medical Examiner’s Office Morgue Renovation – Phase 5 (Electrical) |
October 21, 2019 |
|
|
Buildings and Grounds |
Erie County Medical Examiner’s Office Morgue Renovation – Phase 5 (Furniture) |
October 21, 2019 |
|
|
Buildings and Grounds |
Erie County Medical Examiner’s Office Morgue Renovation – Phase 5 (General) |
October 21, 2019 |
|
|
Buildings and Grounds |
Erie County Medical Examiner’s Office Morgue Renovation – Phase 5 (HVAC) |
October 21, 2019 |
|
|
Buildings and Grounds |
Erie County Medical Examiner’s Office Morgue Renovation – Phase 5 (Equipment) |
October 21, 2019 |
|
|
Buildings and Grounds |
Erie County Medical Examiner’s Office Morgue Renovation – Phase 5 (Plumbing) |
October 21, 2019 |
|
|
Buildings and Grounds |
Rath Building Sub-Basement Asbestos Abatement |
October 10, 2019 |
|
|
Buildings and Grounds |
Aurora Highway Maintenance Facility Precast Panel Repair - REBID |
October 2, 2019 |
|
|
Buildings and Grounds |
Cedar Street Bridge Over Ledge Creek Replacement |
September 26, 2019 |
|
|
Highways |
Cedar Street Bridge over Ledge Creek (261-01) Replacement |
September 26, 2019 |
|
|
Buildings and Grounds |
Erie County Health Lab Building 17 – AA & BB RTU Replacements - REBID |
September 10, 2019 |
|
|
Buildings and Grounds |
REBID-ECHC Kitchen Floor Replacement & Kitchen/Laundry Domestic Hot Water Upgrades |
September 5, 2019 |
|
|
Buildings and Grounds |
Aurora Highway Maintenance Facility Precast Panel Repair |
June 26, 2019 |
|
|
Buildings and Grounds |
ECC Exterior Restoration - City Campus Old Post Office 2019 Transformer Vault Repairs (Rebid) |
June 25, 2019 |
|
|
Buildings and Grounds |
Rath Building, Jesse E. Nash Health Center, Lancaster Sign Shop - Domestic Water Backflow Preventer Installations |
June 10, 2019 |
|
|
Buildings and Grounds |
Public Safety Campus, 5th Floor DNA Lab HVAC Piping Improvements |
June 7, 2019 |
|
|
Buildings and Grounds |
Erie County Home – Fuel Tank Removal |
June 7, 2019 |
|
|
Buildings and Grounds |
Erie County Health Lab Building 17-AA & BB RTU Replacements |
May 31, 2019 |
|
|
Highways |
2019 Overlay B |
May 24, 2019 |
|
|
Highways |
Rehabilitation and Reconstruction of North and South Main Street |
May 24, 2019 |
|
|
Highways |
2019 Capital Overlay A |
May 17, 2019 |
|
|
Highways |
2019 Bridge Deck Sealing |
April 25, 2019 |
|
|
Highways |
Amsdell Road Culvert Over Drainage Channel Rebid |
April 25, 2019 |
|
|
Highways |
East and West Road Rehabilitation |
April 18, 2019 |
|
|
Highways |
2019 Bridge Joints and Overlays (5 bridges) |
March 29, 2019 |
|
|
Buildings and Grounds |
Erie Community College City Campus 2018 Ellicott Street Building Elevator Modernization |
March 28, 2019 |
|
|
Highways |
Lake Avenue Reconstruction |
March 28, 2019 |
|
|
Highways |
Trevett Road Bridge 420-02 over Eighteen Mile Creek Replacement |
March 28, 2019 |
|
|
Buildings and Grounds |
Ellicott Creek Park - Reconstruction of Shelter #6 & #7 and Demolition of Concession Stand Addition and Shelter #9 |
March 18, 2019 |
|
|
Buildings and Grounds |
Buffalo & Erie County Public Library 2019 Auditorium Renovations - Phase 2 |
March 12, 2019 |
|
|
Buildings and Grounds |
New Era Field Year 6 Capital Improvement Allowance Projects |
March 5, 2019 |
|
|
Buildings and Grounds |
Buffal & Erie County Botanical Gardens - 2017 - Renovations to Houses 1, 4, 7, 10, 11 & 12 - General |
February 19, 2019 |
|
|
Buildings and Grounds |
Buffalo & Erie County Botanical Gardens - 2017 - Renovations to Houses 1, 4, 7, 10, 11 & 12 - Electrical |
February 19, 2019 |
|
|
Buildings and Grounds |
120/134 West Eagle Roof Replacement, Phase 2 |
February 7, 2019 |
|
|
Highways |
Vermont Street CR226 Site 9 Drainage Improvements & Roadway Reconstruction |
January 17, 2019 |
|
|
Highways |
Genesee Road and Sibley Road Safety Improvements |
December 6, 2018 |
|
|
Highways |
Quaker Street Bridge Replacement |
November 29, 2018 |
|
|
Highways |
Tonawanda Rails to Trails Extension – Phase II, State Street to East Niagara Street, City of Tonawanda |
November 8, 2018 |
|
|
Buildings and Grounds |
Erie Community College North 2017 – Spring Student Center Roof Replacement - General |
October 30, 2018 |
|
|
Buildings and Grounds |
Erie Community College North 2017 – Spring Student Center Roof Replacement - Mechanical |
October 30, 2018 |
|
|
Buildings and Grounds |
Various County Facilities – Various Backflow Preventers & Rath Building Parking Level Sprinkler System PC |
October 9, 2018 |
|
|
Buildings and Grounds |
Various County Facilities – Various Backflow Preventers & Rath Building Parking Level Sprinkler System FP |
October 9, 2018 |
|
|
Highways |
Dona Street Extension |
October 4, 2018 |
|
|
Highways |
REPLACEMENT OF THE HEISE ROAD BRIDGE 283-1 OVER RANSOM CREEK |
October 4, 2018 |
|
|
Highways |
Ellicott Creek Park Pedestrian Bridge |
September 13, 2018 |
|
|
Buildings and Grounds |
BNCC 2018 Energy Efficient Modifications & Various Improvements to the Exhibit Hall - General Construction |
September 6, 2018 |
|
|
Buildings and Grounds |
BNCC 2018 Energy Efficient Modifications & Various Improvements to the Exhibit Hall - Electrical |
September 6, 2018 |
|
|
Highways |
2018 Culvert Group 2 |
August 9, 2018 |
|
|
Highways |
Slide Remediation of Belscher Road |
August 2, 2018 |
|
|
Highways |
2018 Capital Overlay Contract B |
July 19, 2018 |
|
|
Highways |
2018 Culvert Group 1 |
July 19, 2018 |
|
|
Buildings and Grounds |
ECMC - Medical Examiners Building Roof Re-coating |
July 3, 2018 |
|
|
Buildings and Grounds |
BNCC 2018 Phase 2 Toilet Room Renovations |
June 29, 2018 |
|
|
Highways |
2018 Capital Overlay of Garrison Road - County Road 289 |
June 21, 2018 |
|
|
Highways |
2018 Capital Overlay Contract A |
May 31, 2018 |
|
|
Highways |
Warner Hill Road Culvert Replacement |
May 10, 2018 |
|
|
Highways |
AKRON FALLS PARK - RETAINING WALL REHABILITATION |
May 10, 2018 |
|
|
Buildings and Grounds |
ADA Improvements Erie County Holding Center |
May 7, 2018 |
|
|
Buildings and Grounds |
ADA Improvements Erie County Holding Center - Mechanical Rebid |
May 7, 2018 |
|
|
Highways |
Safety Improvements at Colvin Blvd (CR118) and Brighton Rd CR196 |
May 3, 2018 |
|
|
Buildings and Grounds |
EC Polling Sites Improvements and ADA Upgrades – 2017 Ellicott Creek Park – Friendship Center |
February 28, 2018 |
|
|
Buildings and Grounds |
Clarence Maintenance Facility Waterline Replacement Project |
February 27, 2018 |
|
|
Buildings and Grounds |
New Era Field 2017-2018 Yr. 5 Capital Allowance Improvement Projects |
February 27, 2018 |
|
|
Highways |
2017- BRIDGE WASHING, VARIOUS BRIDGES |
November 30, 2017 |
|
|
Buildings and Grounds |
New Era Field - Fieldhouse Roof Recoating - General Construction |
November 16, 2017 |
|
|
Buildings and Grounds |
Erie Community College South-Roof Repairs and Recoating - Rebid |
November 14, 2017 |
|
|
Highways |
Lakeshore Shoreline Trail Multi-Use Pathway Phase 3 Project |
November 2, 2017 |
|
|
Buildings and Grounds |
Erie County Youth Detention - Interior Housing Renovations - General Construction |
August 31, 2017 |
|
|
Buildings and Grounds |
Erie County Youth Detention - Interior Housing Renovations - Electrical |
August 31, 2017 |
|
|
Buildings and Grounds |
Erie County Youth Detention - Interior Housing Renovations - Mechanical |
August 31, 2017 |
|
|
Buildings and Grounds |
Erie County Youth Detention - Interior Housing Renovations - Plumbing & Fire Protection |
August 31, 2017 |
|
|
Buildings and Grounds |
Erie County Polling Site Improvements - ADA Upgrades - 120/134 W Eagle Street |
August 24, 2017 |
|
|
Highways |
Reconstruction of Goodrich Road - Phase 2 |
July 13, 2017 |
|
|
Buildings and Grounds |
Youth Detention Facility - 2016 - Parking Lot Expansion and Paving |
June 30, 2017 |
|
|
Buildings and Grounds |
Rath Building - Social Services - 7th Floor Renovations - Electrical (Re-Bid) |
June 13, 2017 |
|
|
Highways |
2017 Capital Overlay Contract B |
June 1, 2017 |
|
|
Buildings and Grounds |
Erie County Correctional Facility - Parking Lot and Access Road - Reconstruction - Phase II |
June 1, 2017 |
|
|
Buildings and Grounds |
Rath Building - Fitness Center - Locker Room Improvements |
June 1, 2017 |
|
|
Highways |
2017 Capital Overlay Contract A |
May 11, 2017 |
|
|
Highways |
Maple Road Joint Rehabilitation |
April 27, 2017 |
|
|
Highways |
Stony Road Bridge & Culvert Replacement |
March 30, 2017 |
|
|
Highways |
Elmwood Avenue Pedestrian & Bicycle Improvements Project |
March 2, 2017 |
|
|
Highways |
Replacement of Salt Road Bridges over Beeman Creek |
January 26, 2017 |
|
|
Highways |
2016 Bridge Painting and Repairs |
January 12, 2017 |
|
|
Highways |
2016 Miscellaneous Culvert Repairs Group 1 |
September 22, 2016 |
|
|
Highways |
Berg Road Bridge Rehabilitation with Mill and Overlay Alternate |
August 29, 2016 |
|
|
Highways |
Bridge Deck and Steel Repairs |
August 4, 2016 |
|
|
Highways |
2016 Capital Overlay Contract B |
August 1, 2016 |
|
|
Highways |
Losson Road Rehabilitation |
August 1, 2016 |
|
|
Highways |
Deck Sealing |
August 1, 2016 |
|
|
Highways |
2016 Capital Overlay Contract A |
May 31, 2016 |
|
|
Highways |
Swift Mills Road Bridge Replacement |
April 28, 2016 |
|
|