Tennis Courts Resurfaced |
Four (4) courts in poor shape. The surface has cracks, voids, and hardware unusable. All four (4) courts were repaired, resurfaced, and painted. New hardware, nets, and posts included. |
$128,080.00 |
Parking Lot & Roadway Improvements - Phase 1 |
Maintenance shop parking lot in poor condition with cracks, broken (sunken) drains, and voids. Three (3) Parking lots and 2 miles of roadway within CRP repaired (Paved/Oil & Chipping) and two (2) drains replaced. |
$185,706.00 |
Storage Building |
Roof leaking all around skylights and in overall poor condition. New roof, replace rotted wood decking, remove skylights, and reconnected/improved electrical feed. |
$17,341.00 |
Mechanic Shop - Phase 1 |
Both buildings (attached) need roofs replaced. Water leaks and rotted wood. Replacing with Metal Roof and any necessary replacement of rotted wood decking and fascia as needed. |
$102,241.00 |
Parking Lot/Electrical and Accessibility Improvements |
Safety and direction of visitors, low light conditions, and electrical upgrades needed. Formalized Parking Lot, upgrades, and improvements to accessibility/lighting/electrical service. New concrete sidewalks and blacktop around Casino. |
$586,949.00 |
Guiderail Installation |
All three (3) entrances/ exits from Rt. 277 in poor shape and needed to be upgraded. Removed old concrete posts and replaced entrances/exits with guide rail that meets code, is not damaged, and looks better. |
$26,212.00 |
Parking Lot & Roadway Improvements—Phase 2 |
Continued improvements to various roadways within the park that are in poor condition. Construction Road, Fire Tower Loop, Shelter #2, and Commissioners Cabin Road. |
$62,266.00 |
Lower End Shelter/Parking Lot Rehabilitation |
Lower-end shelters need repairs (including parking lots and concrete pads). Shelters #25, #27, #27a, #28a, #29a, all received new roofs, some roof trusses/concrete pads/improved parking areas. |
$93,712.00 |
Lower End Work—Phase 2 |
Shelter #37B renovations needed. Strip and replace the roof, replace all rotted wood, painting new stone driveway/parking area. |
$10,310.00 |
Martin Lodge |
Outdated, doors no longer working properly, and masonry repairs. Poured a new floor, replaced doors, upgraded restroom fixtures, and repaired damaged block/masonry areas. |
$65,365.00 |
Additional Tennis Court Resurfacing |
Additional eight (8) courts in poor shape. The surface has cracks, voids, and hardware unusable. All eight (8) courts were repaired, resurfaced, and painted. New hardware, nets, and posts included |
$260,000.00 |
Mechanic Shop—Phase 2 |
Damaged/ rotted siding inefficient windows, doors. Siding, doors, overhead doors boxed in, new windows, etc. |
$106,000.00 (85% complete) |
Casino Doors |
Doors no longer working properly. Doors replaced. |
$13,141.00 |
Comfort Station #28/Shelter #4 |
New Roof, access improved, rotted, site work, wood, and new concrete pad/ floor. A new concrete pad poured at Shelter #4, a new roof on C.S. #28, replaced rotted fascia, and opened up public access. |
$25,234.00 |
Roadway & Parking Lot improvements |
Several locations throughout the park in need of repairs/ resurfacing. A few areas were able to be completed before the weather shut down for the rest of 2014. |
$220,000.00 Estimate– work was part of HWYs bid |
Parking Lot & Roadway Improvements - Phase 2 |
Continue efforts to improve areas within the park that are in poor condition/ shape. Culvert replaced in the lower end of the park. Parking area at Shelter 8 and a roadway to the comfort station, oil/chipped. |
$248,066.00 |
Storage Building |
Some rot, roof, and skylight windows in poor condition. New roof, fixed rot, removed skylight windows |
$74,024.00 |
Comfort Station #9 |
Updates needed. Complete refurbishment of the restroom. Facilities. |
$9,288.00 |
Martin Lodge |
The floor cracked and unsafe, fascia rotting. New floor installed, rot repair |
$10,000.00 |
Shelters 8 & 18 |
Shelter condition so poor it cannot be rented until improvements are completed. New roof, parking area, and trusses installed, new concrete pad poured. Shelter 18 completely re-built. |
$156,391.00 |
Shelter 23 Reconstruction |
WPA- era shelter with conditions so poor it cannot be rented until improvements are completed. Shelter 23 completely re-built. |
$99,990.00 |
Eternal Flame Parking Area |
The fence around the parking lot in disrepair. New fencing installed. |
$12,445.00 |
Maintenance Shop Roof |
Age and overall poor condition. The roof was completely torn off and replaced. |
$150,000.00 |
Comfort Station #8 |
Updates needed—complete renovation, including ADA accessible stalls. |
$35,521.00 |
Casino Fire Alarm Upgrade |
The current fire alarm system outdated and inadequate. New fire alarm system installed. |
$17,928.00 |
Shelter 21 |
Roof in disrepair. Roof replaced. |
$3,512.00 |
Shelter 12/13 Comfort Station |
Inadequate Plumbing. New toilets, plumbing fixtures, and piping installed |
$2,974.00 |
Concession Stand Renovations |
Upgrades needed. New tile floor and countertops installed, painted, wall repair, plumbing, and electrical upgrades |
$41,928.00 |
Tow Rope Installation |
Furnished installation of Ski Tow Rope. |
$115,652.00 |
New Water Main RPZ Installed for the Upper End of the Park |
Installed new water main on the upper end. |
$11,685.00 |
WPA Culvert Wing Walls |
Installation of four (4) WPA stone wing walls. |
$156.000.00 |
Casino Masonry Improvements |
Various stones and improvements to the casino. Funding provided by CRC |
$20,000.00 |
Tennis Court Lighting |
Providing lighting to the upper four (4) courts. Funding provided by CRC. |
$25,000.00 |