Chestnut Ridge Capital Projects

Redirecting to our new, updated website ...

Chestnut Ridge Park

2012 - 2021 Capital Improvements:

 

  Project Name

Type of Work Completed

 Estimated Cost to Complete

 

Tennis Courts Resurfaced

Four (4) courts in poor shape. The surface has cracks, voids, and hardware unusable. All four (4) courts were repaired, resurfaced, and painted. New hardware, nets, and posts included.

$128,080.00

Parking Lot & Roadway

Improvements - Phase 1

Maintenance shop parking lot in poor condition with cracks, broken (sunken) drains, and voids. Three (3) Parking lots and 2 miles of roadway within CRP repaired (Paved/Oil & Chipping) and two (2) drains replaced.

$185,706.00

Storage Building

Roof leaking all around skylights and in overall poor condition. New roof, replace rotted wood decking, remove skylights, and reconnected/improved electrical feed.

$17,341.00  

Mechanic Shop - Phase 1

Both buildings (attached) need roofs replaced. Water leaks and rotted wood. Replacing with Metal Roof and any necessary replacement of rotted wood decking and fascia as needed.

$102,241.00

Parking Lot/Electrical and Accessibility Improvements

Safety and direction of visitors, low light conditions, and electrical upgrades needed. Formalized Parking Lot, upgrades, and improvements to accessibility/lighting/electrical service. New concrete sidewalks and blacktop around Casino.

$586,949.00

Guiderail Installation

All three (3) entrances/ exits from Rt. 277 in poor shape and needed to be upgraded. Removed old concrete posts and replaced entrances/exits with guide rail that meets code, is not damaged, and looks better. 

$26,212.00

Parking Lot & Roadway Improvements—Phase 2

Continued improvements to various roadways within the park that are in poor condition. Construction Road, Fire Tower Loop, Shelter #2, and Commissioners Cabin Road.

$62,266.00

Lower End Shelter/Parking Lot Rehabilitation

Lower-end shelters need repairs (including parking lots and concrete pads). Shelters #25, #27, #27a, #28a, #29a, all received new roofs, some roof trusses/concrete pads/improved parking areas.

$93,712.00

Lower End Work—Phase 2

Shelter #37B renovations needed. Strip and replace the roof, replace all rotted wood, painting new stone driveway/parking area.

$10,310.00

Martin Lodge

Outdated, doors no longer working properly, and masonry repairs. Poured a new floor, replaced doors, upgraded restroom fixtures, and repaired damaged block/masonry areas.

$65,365.00

Additional Tennis Court Resurfacing

Additional eight (8) courts in poor shape. The surface has cracks, voids, and hardware unusable. All eight (8) courts were repaired, resurfaced, and painted. New hardware, nets, and posts included

$260,000.00

Mechanic Shop—Phase 2

Damaged/ rotted siding inefficient windows, doors. Siding, doors, overhead doors boxed in, new windows, etc.

$106,000.00 

(85% complete)

Casino Doors

Doors no longer working properly. Doors replaced.

$13,141.00

Comfort Station #28/Shelter #4

New Roof, access improved, rotted, site work, wood, and new concrete pad/ floor. A new concrete pad poured at Shelter #4, a new roof on C.S. #28, replaced rotted fascia, and opened up public access.

$25,234.00

Roadway & Parking Lot

improvements

Several locations throughout the park in need of repairs/ resurfacing. A few areas were able to be completed before the weather shut down for the rest of 2014.

$220,000.00

Estimate– work was part of HWYs bid

Parking Lot & Roadway

Improvements - Phase 2

Continue efforts to improve areas within the park that are in poor condition/ shape. Culvert replaced in the lower end of the park. Parking area at Shelter 8 and a roadway to the comfort station, oil/chipped.

$248,066.00

Storage Building

Some rot, roof, and skylight windows in poor condition. New roof, fixed rot, removed skylight windows

$74,024.00

Comfort Station #9

Updates needed. Complete refurbishment of the restroom. Facilities.

$9,288.00

Martin Lodge

The floor cracked and unsafe, fascia rotting. New floor installed, rot repair

$10,000.00

Shelters 8 & 18

Shelter condition so poor it cannot be rented until improvements are completed. New roof, parking area, and trusses installed, new concrete pad poured. Shelter 18 completely re-built.

$156,391.00

Shelter 23 Reconstruction

WPA- era shelter with conditions so poor it cannot be rented until improvements are completed. Shelter 23 completely re-built.

$99,990.00

Eternal Flame Parking Area

The fence around the parking lot in disrepair. New fencing installed.

$12,445.00

Maintenance Shop Roof  

Age and overall poor condition. The roof was completely torn off and replaced.

$150,000.00

Comfort Station #8

Updates needed—complete renovation, including ADA accessible stalls.

$35,521.00

Casino Fire Alarm Upgrade

The current fire alarm system outdated and inadequate. New fire alarm system installed.

$17,928.00

Shelter 21

 Roof in disrepair. Roof replaced.

$3,512.00

Shelter 12/13 Comfort Station

Inadequate Plumbing. New toilets, plumbing fixtures, and piping installed

$2,974.00

Concession Stand Renovations

Upgrades needed. New tile floor and countertops installed, painted, wall repair, plumbing, and electrical upgrades

$41,928.00

Tow Rope Installation

Furnished installation of Ski Tow Rope.

$115,652.00

New Water Main RPZ Installed for the Upper End of the Park

Installed new water main on the upper end.

$11,685.00

WPA Culvert Wing Walls

Installation of four (4) WPA stone wing walls.

$156.000.00

Casino Masonry Improvements

Various stones and improvements to the casino. Funding provided by CRC

$20,000.00

Tennis Court Lighting

Providing lighting to the upper four (4) courts. Funding provided by CRC.

$25,000.00

 
                                                                                                                                                                      Total: $3,092,961.00*