2012 - 2021 Capital Improvements:
Project Name |
Type of Work Completed |
Estimated Cost to Complete
|
Carpentry Shop |
Roof in poor condition, leaking, and significant damage/ rot. Roof replaced, replaced rotted wood decking, rafter tails, vinyl soffit and metal flashing. |
$32,540.00 |
Bowen Grove |
Roof in poor condition and leaking in areas, plumbing, lighting and painting needed. Entire roof replaced, including rooted roof decking. Siding installed on gable ends, new lights, amenities and painted. |
$69,790.00 |
Parking Lot & Roadway Improvements—Phase 1 |
Several parking lots and miles of roadway were in terrible condition. Prioritized worst areas to patch/resurface and oil & chip (Lancaster Place parking lot, maintenance lot and roadway throughout). |
$85,000.00 (Estimate- work done as part of a HWYs bid) |
Rich Marino Gazebo Stabilization |
Potential safety issues detected and documented by consultant-structural. As per recommendation by consultant, repaired/improved structure. |
$32,628.00 |
Rich Marino Gazebo Roof |
Age and overall poor condition. Roof replaced while “Out of Service”. |
$44,149.00 |
Cook Shelter Roof |
Age and overall poor condition. Roof replaced while gazebo “out of service”. |
$5,554.00 |
Shelter #1 Roof |
Age, leaking and rotted wood decking. New Roof and sections of rotted wood deck. |
$15,081.00
|
Shelter #4 and #14 Stablization |
Consultant discovered potential safety issues with both structures. Currently making necessary repairs as per recommendation from consultant. |
$15,041.00 |
Casino Doors/Windows |
Very old and non-efficient windows, doors need replacement. Replacing all windows and doors as needed. |
$39,222.00 |
Lancaster Place |
Age and condition of roof, old non-efficient windows, various carpentry work. Replaced roof, carpentry work, windows replaced and painting. |
$31,126.00 |
Parking Lot & Roadway Improvements—Phase 2 |
Continue efforts to improve areas within park that are in poor condition/ shape. Replaced DI at Bowen Grove, paved several roads within park and employee parking area. |
$93,953.00 |
Dam Sedimentation Study |
Dam and lake have become silted in. Consultant studying potential issues, potential remedies and costs associated with to include in 2016 Capital Budget. |
$71,618.00 |
Dam Safety Concern |
Top of dam open to the public and possible safety concern. Vendor provided a fence/gate to block of public from accessing top of dam wall, but allowing to maintain (gate). |
$1,450.00 |
Pedestrian Bridge |
Fence along bridge in disrepair. Fence replaced |
$3,525.00 |
Shelters 9, 29, 36, 38, 56, 58 and “E” Comfort Station Renovations |
Roof in poor shape, concrete pad cracked and uneven, siding in disrepair. Comfort station also had shattered windows, peeling paint and rotted ceilings. New roof installed, new concrete pad poured, new hardy board siding installed. Shelter 9 had 2 pillars and 2 interior posts installed to strengthen roof support and a new plywood drop ceiling. Comfort station had new glass block windows installed, ceiling replacement and interior painting. |
$134,920.00 |
Park Road Guiderails |
Vehicles were going off the road at the curve. New guiderail installed along main park road curve |
$10,771.00 |
Sled Hill Upgrades |
No lighting. Fence in disrepair. Fence replaced, lights installed |
$17,329.00 |
Maintenance Shop Upgrades |
Garage doors were broken, falling down and in overall poor condition. Heat not working. New garage doors and drop down Reznor heating units were installed. |
$11,562.00 |
Shelters 4, 5, 12, 13, 14, 17, 18, 19, 20, 32, 33, 49, 50, Gazebo Comfort Station, “B” Comfort Station Roofs |
Age and overall poor condition. New roof and face boards installed. Shelter 20 also had pillars repaired. |
$71,656.00 |
Multi-Generational Exercise Recreation Area |
Nowhere in park for all generations to exercise together in one area. Installed multi-generational exercise equipment. |
$115,796.00 |
Basketball Court Resurfacing |
Basketball court uneven and cracked. Basketball court repaved and repainted. |
$39,400.00 |
Tennis Court Resurfacing |
Tennis courts uneven and cracked. Tennis courts repaved and repainted. |
$26,290.00 |
Parking Lot & Roadway Improvements- Phase 2 |
Sections of Casino parking lot and park roadway were in terrible condition. Prioritized worst areas to patch/ resurface. |
$85,000.00 |
Casino Restroom Plumbing Upgrade |
Plumbing needed to be updated. New toilets and flush valves installed. |
$1,783.00 |
Shelter #54 Rebuild |
Age and overall poor condition. Complete Demo/ Rebuild. |
$52,859.00 |
Total: $1,108,043.00