Sprague Brook Park
2012 - 2021 Capital Improvements:
Project Name |
Type of Work Completed |
Estimated Cost to Complete
|
Parking Lot & Roadway Improvements |
Several areas throughout park are in poor condition and need to be resurfaced. Two (2) DI’s Repaired, Maintenance Lot resurfaced and roadway near shelter #1 repaired (various patching). |
$28,577.00 |
Tennis Court Repairs/Resurfacing |
All four (4) courts are experiencing major cracks and surface related issues. Resurfacing, painting and all new hardware. |
$78,875.00 |
Parking Lot & Roadway Improvements- Phase 2 |
Continue efforts to improve areas within park that are in poor condition/ shape. Aprons paved around comfort stations "A" and B" in the camping area |
$8,307.00 |
Chlorinator Upgrade |
Chlorinator for campgrounds broke down. Water is no longer potable. Chlorinator upgraded |
$4,198.00 |
Campsite Upgrade |
More electric campsites needed. Converted thirty-two (32) non-electric campsites into electric. |
$229,548.00 |
“A” Comfort Station Roof |
Roof needed replacement. New roof shingles installed. |
$5,764.00 |
Fire Alarm Upgrade |
Current fire alarm system outdated and inadequate. New fire alarm system installed. |
$4,500.00
|
“A” & “B” Comfort Station Renovations |
Restrooms needed complete renovation. New lighting and doors installed. Showers re-tiled. Restrooms painted. |
$97,921.00 |
"A" & "B" Camping Restrooms |
Floors needed replacing. New TIle Floors Installed |
$21,800.00 |
Upper Camping Loop Sanitary System |
New Lift Pumps and Electrical Panel Installed |
$25,500.00 |
TOTAL: $504,990.00