Bennett Beach Capital Improvements

Redirecting to our new, updated website ...

Bennett Beach

2012 - 2021 Capital Improvements:

 

 

Project Name

Type of Work Completed

    Estimated Cost to Complete

 

Comfort Station

Roof condition poor, electric and plumbing issues. Replaced roof, vinyl siding, plumbing fixtures replaced, and electric services upgraded.

$34,614.00

Parking Lot & Roadway Improvements.

Not formalized, rough areas, not large enough to accommodate park. Extended size of the parking lot and formalized with two types (sizes) of stone and rolled. Oil & Chipped roadway.

$34,909.00

Wall removed

Remains of old bathhouse foundation and wall in the middle of the beach. Safety/ Aesthetics. Removed wall and opened up the entire beach while eliminating a long-time hazard and potential safety hazard.

$17,440.00

Storage Building

Needed a place to store equipment. Built pole barn storage building

$33,202.00

Comfort Station Remodel

General overall condition poor. Complete remodel of the comfort station

$78,366.00

Mobile Office

 

$39,944.00

Lifeguard Trailer

 

$8994.00

Beach Accessibility Mat

 

$16,211.00

 

                                                                    TOTAL: $263,680.00*