Bennett Beach
2012 - 2021 Capital Improvements:
Project Name |
Type of Work Completed |
Estimated Cost to Complete
|
Comfort Station |
Roof condition poor, electric and plumbing issues. Replaced roof, vinyl siding, plumbing fixtures replaced, and electric services upgraded. |
$34,614.00 |
Parking Lot & Roadway Improvements. |
Not formalized, rough areas, not large enough to accommodate park. Extended size of the parking lot and formalized with two types (sizes) of stone and rolled. Oil & Chipped roadway. |
$34,909.00 |
Wall removed |
Remains of old bathhouse foundation and wall in the middle of the beach. Safety/ Aesthetics. Removed wall and opened up the entire beach while eliminating a long-time hazard and potential safety hazard. |
$17,440.00 |
Storage Building |
Needed a place to store equipment. Built pole barn storage building |
$33,202.00 |
Comfort Station Remodel |
General overall condition poor. Complete remodel of the comfort station |
$78,366.00 |
Mobile Office |
$39,944.00 |
|
Lifeguard Trailer |
$8994.00 |
|
Beach Accessibility Mat |
$16,211.00 |
TOTAL: $263,680.00*